top of page

Oberoi Mall, Mumbai 

This was the store that had been remodeled. The arrangement was now adjusted such that there were more things to retain. In this, I worked on the technical component, which was followed by 3D, which was not present during the execution, but the drawings were authorised from the team site

Technical Drawing 

All of the renderings and plans were sent to the mall for approval, and when the mall gave its approval for the store's appearance, the manufacturing of the fixtures was scheduled.

Renders

8.jpg

Execution

bottom of page